Miller Lite’s Bar 75 toured the country 5 times a year for 3 years in a row. We built modularly, maximizing material yield for flexibility and durability to create an infrastructure that could be efficiently assembled and disassembled within restricted timelines. It was designed to withstand the high foot traffic and varying site and weather conditions with as little refurb as possible.